capacity for a two-part reeving will require more reeving prior to making a lift that exceeds 28,000 lbs. A reeving chart which indicates 28,000 lbs. How to calculate crane load capacity?ĭoes the crane have sufficient load hoist reeving? Reeving charts indicate the type of wire rope and the number of parts of wire rope required to lift loads. The combined information to this point will lead you to one or more pages within a load chart. Make certain you know the area where the load will be lifted from, the area the load will pass through, and the area the load will be placed.īase lifting capacities on the area with the least load rating according to the working area chart. Over what operating areas will the load be handled? Working Area charts define specific areas of the crane that relate to loading ratings.Īreas such as Over the Side, Over the Rear, Over the Front, and 360-degree Rotation lead you to specific load charts.


You do this because you know these controls must exist to operate safely.

You locate the speedometer and fuel gauge, then locate windshield wiper, outside mirror, and seat adjustment controls. Just as you may expect to find certain information when you enter an unfamiliar automobile. Mobile Crane Load Chart Mobile crane specificationĪn experienced crane operator enters the cab of an unfamiliar crane expecting to find certain information on the load chart. The purpose of this Tech Tip is to help those less familiar with crane load charts better understand the questions to ask and the information that must be followed. Persons who are not crane-operators regularly have questions regarding lifting safety.

Mobile crane load chart: Simply put, the only way to know if the load you are lifting with a mobile crane is within the limitations of the crane is to relate the lift to the manufacturer’s load chart and notes.